The house is completely framed. The rough electric is done. The windows are in. There are piles of tiles sitting in little rows on my roof. (That last sentence was sort of poetic, don't you think?)
We have paid about $1000 to have our sprinklers moved around while we build so that the lawn could stay green (because the city says so). Now we have mountains of junk piled up all over the lawn so that the grass is dead. I am assuming the piles are getting watered regularly.
In the back yard where there are no piles they moved the trampoline into the middle of the yard so that they could kill the most grass with the least effort. On the dirt area where the trampoline used to be they have parked a miniscule tractor-type thing. I can certainly see why it was necessary to move the trampoline for that nice parking place. I wonder what they were supposed to be doing while they played with the trampoline and the little tractor.
This is the latest picture of the front of the house. You will notice that right now the lumber company (Roadside) is getting top billing. That is probably best because there is certainly a lot of lumber.
Here are some living room shots.
Next month maybe the big pile of plumbing fixtures that have made themselves at home in my bedroom will have been installed. Probably not.
No comments:
Post a Comment